Every other line is filled. The quantity box is empty. You lean over the scuffed benchtop, smudge of cutting fluid on your left wrist, and run a finger along the edge of the crumpled sheet where it got caught in the CNC chip tray last shift. No other sections are marked for revision, and the part number and material spec match the 4140 bar stock stacked two feet to your right. You don’t have to hunt for authorization before you fill that box, as long as you cross-reference the two matching line items the sheet flags for comparison.
This traveler cross-references Estimated Run Yield and Completed First Pass Count
Line 3, Estimated Run Yield, is pre-filled by the production scheduler based on average output for this part number over the last 12 runs, accounting for standard tool wear and minor material variation. Line 12, Completed First Pass Count, was filled out by the night shift operator when they finished the first 8 hours of the run, after they ran the first batch of parts through the initial dimensional check. You check both numbers first to make sure there’s no gap larger than the allowed 5% variance for low-complexity turned parts. If the variance is under that threshold, you can use the two numbers to calculate the baseline for the blank quantity box without waiting for a supervisor signoff. Illustrative example: if the estimated run yield is 227 parts, and the completed first pass count is 219, the variance is just 3.5%, well under the allowed limit. You don’t have to cross-check the yield number against old run records unless the variance jumps over that 5% threshold, which only happens if there was a major tooling change or material batch shift that the scheduler didn’t note on the sheet. The night shift operator already marked that they used the standard carbide insert tooling for this run, and the material lot number matches the spec listed on the top of the sheet, so you don’t have to flag any unexpected variables before you move to the next comparison.

This sheet contrasts First Pass Reject Totals and Adjusted Material Allowance
Line 14, First Pass Reject Totals, lists how many parts failed initial dimensional check right off the lathe, marked for either rework or scrap by the night shift quality tech. Line 8, Adjusted Material Allowance, accounts for extra bar stock ordered to cover expected rejects for this run, calculated as a percentage of the total estimated yield. You subtract the reject total from the adjusted material allowance to see how many extra parts you can run without pulling more stock from the rack at the back of the shop. If the allowance covers the rejects fully, you don’t have to adjust the initial yield number before filling the quantity box. The Adjusted Material Allowance is calculated to cover 7% of the initial yield as expected rejects, so if the first pass reject total is under that 7% mark, you have enough extra stock to run replacement parts for all the rejects without tapping into the reserve stock kept in the locked storage cage. For the earlier example, 7% of 227 is roughly 16 parts, so if the first pass reject total is 11, you have 5 extra parts worth of stock left to cover any additional rejects during the second pass of the run.
This work document compares Scrapped Part Count and Approved Rework Eligibility
Line 15, Scrapped Part Count, separates parts that are too badly warped or out of tolerance to fix from those that qualify for rework, marked with a red X by the quality tech. Line 9, Approved Rework Eligibility, lists the specific defects that can be corrected with a secondary pass on the mill or a quick deburr and tolerance adjustment, including minor surface blemishes and small off-spec outer diameter measurements. You add the number of rework-eligible parts to the first pass count to get the current total of usable parts before you account for the remaining uncut stock. This step ensures you don’t overcount parts that will never make it to final inspection, and don’t undercount parts that just need a small adjustment to meet spec. If you find that the scrapped part count is higher than the adjusted material allowance, you stop your calculation and flag the sheet for a supervisor to approve pulling extra stock before you enter any number in the quantity box. That step prevents you from noting a quantity you can’t actually produce with the material you have on hand, which avoids delays downstream in the finishing and coating departments.
To calculate the correct number for the blank quantity box, follow these steps:
- Add the Completed First Pass Count and the rework-eligible reject count to get your current usable part total.
- Subtract the Scrapped Part Count from the Adjusted Material Allowance to find how many additional parts you can cut from the remaining stock.
- Add that additional part count to your current usable part total to get the maximum expected full run quantity.
- Write that final number in the blank quantity box, initial next to it, and mark the date and time in the adjacent notes field.
This same run record matches projected full batch volume and final entered quantity when you pull it up for post-run signoff
When you come back to this sheet after you finish the full run and all rework is complete, you’ll compare the number you entered in the quantity box to the actual final count of parts that pass final dimensional inspection. You’ll note any variance between the two numbers in the notes field, along with the reason for the gap, whether that’s unexpected material flaws, a tool break mid-run, or a higher than expected rework success rate. You don’t have to redo any calculations from your earlier pass as long as the variance is under 10%, and you can sign off on the run once you confirm all line items match the physical parts stacked in the labeled bin next to your bench. When you pull this sheet up for post-run signoff, you’ll also cross-reference the quantity you entered with the number of parts logged in the shop’s inventory system, to make sure there’s no discrepancy between the paper record and the digital log. If all numbers align, you sign the bottom of the sheet and file it in the completed run bin by the door. If the variance is higher than 10%, you flag the sheet and leave it at the Traveler Desk for the production scheduler to review before the next run of this part number, so they can adjust the estimated yield for future runs to match the actual output you saw on this batch. You don’t have to fill out any additional paperwork for variances under 10%, as those are considered normal for small-batch turned parts with tight tolerance requirements. Once filed, the sheet stays in the completed run archive for 18 months, for reference if any questions come up about the batch during assembly or end-use testing.
